ELV system design for Long Binh Depot
VFT is the design unit of the network and information technology system for the Depot area of the project and is also the supplier and implementation unit for general contractor Hitachi in package No. 3 for the procurement of electromechanical equipment and rolling stock. vehicles, rails, maintenance of urban railway construction project No. 1 in the city. Ho Chi Minh (Ben Thanh – Suoi Tien).
The depot of line 1 Ben Thanh – Suoi Tien is located in Long Binh ward, Thu Duc city with an area of about 27.4 hectares. is the train control and maintenance center for line 1 until 2040. Including operation and maintenance buildings; main workshop for ship maintenance; infrastructure for maintaining other railway equipment, electrical systems, signals, and communications; ship parking lot; ship cleaning station; internal road network inside and outside the area; and office area.